Concept 1 of 61 min
Contribution, break-even, operating leverage and bottlenecks
Break-even and margin of safety
| Price | 80 |
|---|---|
| Variable cost | 52 |
| Fixed costs | 700,000 |
| Revenue | 2.5 million |
- Contribution = 80 − 52 = 28
- Ratio = 28 ÷ 80 = 0.35
- Break-even = 700,000 ÷ 0.35 = 2,000,000
- Safety = 1 − 2 ÷ 2.5 = 20%
Revenue of 2,500,000 can fall 20% before the business makes a loss.
A scarce machine hour
| Product A | 18 in 3 hours |
|---|---|
| Product B | 20 in 5 hours |
- A = 18 ÷ 3 = 6 an hour
- B = 20 ÷ 5 = 4 an hour
With hours scarce, A comes first despite its lower margin per unit.
The margin of safety is (revenue − break-even) ÷ revenue, and operating leverage is %ΔEBIT ÷ %Δrevenue. A price cut needs volume up by old ÷ new unit contribution − 1, and a scarce resource goes to the highest contribution per unit of it.
Multiplying fixed costs by the ratio is the classic slip. Dividing the safety margin by break-even instead of revenue overstates it.
High fixed costs amplify changes in revenue, up and down. A small price cut on a thin unit contribution needs a large volume gain to stand still.
With a bottleneck, ranking products by contribution per unit sold misallocates the scarce hours.
- Multiplying fixed costs by the margin ratio.
- Dividing the margin of safety by break-even revenue.
- Ranking products by contribution per unit when a resource is scarce.
Sales wants to cut prices 10% to win volume. How would you test whether it makes sense?
A complete answer covers
- Compute contribution per unit before and after the cut.
- Work out the volume rise needed to keep total contribution.
- Judge whether the market can deliver that volume and capacity can serve it.
- Consider competitors' reaction and the effect on existing customers.
Also in our technical interviews, on camera, with a score.
Concept 2 of 61 min
Relevant costs: special orders, make or buy, closures
The why, the charts, the worked example and the interview questions are in Essentials, with every quiz.
See the plansSign inConcept 3 of 61 min
Overheads: absorption, under-absorption and activity-based costing
The why, the charts, the worked example and the interview questions are in Essentials, with every quiz.
See the plansSign inConcept 4 of 61 min
Standard costing and variances
The why, the charts, the worked example and the interview questions are in Essentials, with every quiz.
See the plansSign inConcept 5 of 61 min
Responsibility centres, transfer prices and strategic costing
The why, the charts, the worked example and the interview questions are in Essentials, with every quiz.
See the plansSign inConcept 6 of 61 min
AdvancedFilling a bottleneck and pricing an extra hour
The why, the charts, the worked example and the interview questions are in Essentials, with every quiz.
See the plansSign inRecap
- Contribution margin = (price − variable cost) ÷ price; break-even revenue = fixed costs ÷ that margin; margin of safety is measured on actual revenue.
- Only future costs that differ between options count: sunk costs never, scrap value and opportunity costs always.
- Fixed costs that stay whatever you decide do not belong in make-or-buy or closure decisions.
- Absorption rate = budgeted overheads ÷ budgeted activity; building stock flatters absorption profit; ABC charges overheads by the activities used.
- Variances use the standard: price × actual quantity, efficiency × standard rate; managers are judged on what they control.
25 questions on Management accounting
Timed, like the real one, drawn from a bank of 33. Every answer explained.